The construction site is located on the territory of the Belarusian Gas Processing Plant, in Rechitsky district, Gomel region, Republic of Belarus. The projected photovoltaic plant is located on two sites 100 m apart. The design solutions provide for the installation of photovoltaic panels, a switchgear and inventory stations.
A driveway with asphalt concrete pavement is designed along the perimeter of the sites, a metal mesh fence is arranged. A lawn is arranged on the areas of the territory that are free of buildings and coverings.